Mopar Insiders Forum

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Jeep J8 for italian army

MJAB

Member
Joined
Oct 17, 2019
Messages
45
Reaction score
62
Italian army assigned a contractor to AADS (Africa Automotive Distribution Services Ltd) automotive group for 210 Jeep J8 Wrangler, of wich 200 light and 10 standard versions.
The light ones are similar to civilian ones. The engines should be 2.2 and/or 3.0 Diesel engines.
They will take place of some AR90 (Land Rover Defender).

The assembly should take place in Gibraltar.

Total cost is something less that Euro 15 millions, and include technical maintenance for 150k km or 6 years. There is an optional for other 210 vehicles.
The other company that partecipated to the bid was FCA Fleet and Tenders S.r.l .
 

sjon

Member
Joined
Jun 29, 2018
Messages
53
Reaction score
44
Italian army assigned a contractor to AADS (Africa Automotive Distribution Services Ltd) automotive group for 210 Jeep J8 Wrangler, of wich 200 light and 10 standard versions.
The light ones are similar to civilian ones. The engines should be 2.2 and/or 3.0 Diesel engines.
They will take place of some AR90 (Land Rover Defender).

The assembly should take place in Gibraltar.

Total cost is something less that Euro 15 millions, and include technical maintenance for 150k km or 6 years. There is an optional for other 210 vehicles.
The other company that partecipated to the bid was FCA Fleet and Tenders S.r.l .
vehicles-4.jpg

 

redriderbob

Mopar Guru!
Staff member
Joined
Apr 21, 2018
Messages
5,110
Reaction score
3,761
Location
Metro Detroit
Italian army assigned a contractor to AADS (Africa Automotive Distribution Services Ltd) automotive group for 210 Jeep J8 Wrangler, of wich 200 light and 10 standard versions.
The light ones are similar to civilian ones. The engines should be 2.2 and/or 3.0 Diesel engines.
They will take place of some AR90 (Land Rover Defender).

The assembly should take place in Gibraltar.

Total cost is something less that Euro 15 millions, and include technical maintenance for 150k km or 6 years. There is an optional for other 210 vehicles.
The other company that partecipated to the bid was FCA Fleet and Tenders S.r.l .

Production for the new J8 will start on February 15th.
 

Users who are viewing this thread

Top